Christmas Merch Order Deadlines: When to Brief, Approve and Ship

Christmas Merch Order Deadlines: When to Brief, Approve and Ship

Christmas Merch Order Deadlines: When to Brief, Approve and Ship

Christmas Merch Order Deadlines: When to Brief, Approve and Ship

3

Minimum Read

Christmas Merch Order Deadlines: When to Brief, Approve and Ship

Most teams plan Christmas merch backward from Christmas. That is the wrong anchor, and it is why so many orders arrive in the first week of January.

The date that matters is the last day your people are in the office, or the last day a courier can reach a home address before everything shuts down. For many companies that falls somewhere between 11 and 18 December. Work backward from there through four stages, not one: design, approval, production, then shipping.

Only one of those is printed on the product page. Monday Merch product timelines currently allow 0 to 1 business day for free design, list a standard production time for each product, and add a shipping estimate for the chosen destination. They also warn that revisions or later approval move the delivery dates.

There are two layers to get right. Monday Merch publishes official deadline bands for the Christmas campaign, which tell you what is still possible in a given month. Underneath those, each product carries its own production time, running from 4 to 36 business days, and each destination its own shipping estimate. The bands tell you whether to start; the product page tells you whether you will make it.

Approval is the stage that quietly eats weeks. Design concepts and a quote come back within 24 hours, so the front of the process is fast. Getting sign-off from marketing, then from whoever owns the budget, then from the person who noticed the logo looked slightly off, is what turns a three-week timeline into a six-week one. Monday Merch does not publish a fixed allowance for customer approval and revisions, so that time is yours to budget and yours to lose.

What follows is the Christmas range organised by the thing that matters most at this point in the year: how long each product takes to make. Three bands, twenty-one products, and an honest note on what each one costs you in time.

The official 2026 Christmas deadlines

Start here, before you look at a single product. Our Christmas packs page sets the campaign-level rule for what is still achievable in a given month.

Order period

What is still possible

September

Full access, no limits. Custom packaging, bespoke products, engraved gifts and premium kits are all open, with every timeline on your side.

October

Still the safe zone, but not for everything. Around 95% of options remain on the table, including premium kits, branded apparel and most custom items. Highly bespoke projects may already be out of reach.

Early November

Last call for semi-custom. Some custom merch is still possible if you act fast.

November, from week 3

Pre-made gifts and simple items only. No logos, no complex kits.

December

In-stock only, no branding. Think ready-to-ship items: snacks, drinks or gifts. If it is not packed already, it will not make it.

Read the December row carefully, because it is the one that surprises people. It is not that branded merch gets difficult in December. It is that branded merch is over. If a logo has to appear on anything, the decision belongs in November at the latest.

Missed it? Send a New Year pack instead

There is a second option in the November band that most people never consider, and it is better than the compromise they usually settle for.

Instead of stripping the branding out to squeeze something through before the 25th, order properly and deliver in January as a New Year gift pack. You keep the custom work, the packaging and the quality. You also get something a Christmas gift cannot give you: people are back at their desks, nothing is competing for their attention, and the gift lands as motivation for the year ahead rather than as one more parcel in the December pile.

It also lets you order after everyone has made their choice rather than guessing sizes and preferences under time pressure. If you are reading this in late November and the honest answer is that Christmas has gone, this is the better brief.

There is also a lever that removes the deadline problem altogether, and almost nobody uses it. Christmas orders qualify for free warehousing: order early, and we store the gifts at no cost until you want them released. Projects started as early as August qualify. That separates the production clock from the delivery clock entirely, which is the only real way to stop having this conversation every November. Our warehousing service covers how the stock is tracked and dispatched.

What the bands do not do is give you a date. They tell you whether to start, not whether you will make it. For that you need the product and the destination, which is the rest of this article.

Start with the in-hands date

Choose the date when the gifts need to be with the recipient, then work backwards using the live delivery timeline on the product page. Four inputs decide the answer:

  • The destination country

  • The product’s standard production time

  • The live shipping estimate for that destination

  • Your own approval and revision plan

Monday Merch publishes free designs and a quote within 24 hours, and product timelines show this stage as 0 to 1 business day. A fixed allowance for customer approval is not published, so it is not built into any of the numbers below.

A standard kitting allowance is not published either, and neither is a Christmas courier-capacity buffer. If your project involves packs, individual home delivery or a firm event date, ask your Monday Merch contact for a project-specific schedule rather than assuming one.

Shipping time changes by destination

The delivery timeline on the website currently shows these standard shipping estimates:

Destination

Published shipping estimate

Netherlands

1 to 2 business days

Germany

2 to 3 business days

United Kingdom

2 to 3 business days

United States

3 to 5 business days

These ranges make every final cut-off destination-specific. Select the destination on the live product page before committing to a date, and use the later end of the range when working backwards. Revisions or later approval move the estimate.

Products with 4 to 9 business days of production

The fast band. Stock products with standard decoration, or consumables where any branding sits on the packaging rather than on the item itself. If you are starting from nothing, this is your section.

Product

Standard production

Minimum quantity

Catalogue note

Small Bar Tony’s Chocolonely

4 business days

15

The current page lists this product as not customisable. Warm weather may delay delivery.

Large Bar Tony’s Chocolonely

4 business days

15

The current page lists this product as not customisable. Warm weather may delay delivery.

Christmas Card

5 business days

10

A5 or A6, with single-sided or double-sided full-colour printing.

Paper Filling

5 business days

15

A packaging component made from recycled paper fibre, available in several colours.

Celebrations Mix Box

6 business days

15

The current page lists this product as not customisable.

Rituals Medium Gift Set

6 business days

15

The current page lists this product as not customisable.

Relaxed Sweatshirt

8 business days

15

Oversized fit, with transfer print, silkscreen and embroidery options.

Full Colour Mug

9 business days

15

A 0.3 l stoneware mug with full-colour sublimation printing.

Four of these eight are listed as not customisable on their current product pages. That does not rule them out, but it does mean the branding has to live on the card, the filling or the box around them, so budget for those alongside.

Small Bar Tony’s Chocolonely

Small Bar Tony’s Chocolonely

Picture the situation: the budget was approved yesterday and you have 180 people expecting something. This is the product that solves it. Four business days is the shortest standard production time in the Christmas range, and the minimum order is 15 units.

What makes it work is that Tony’s is a brand people already like and already trust, with a genuine ethical position behind it rather than a marketing one. You are not asking anyone to accept a generic chocolate bar; you are giving them something they might have bought themselves.

One thing to plan around: the current product page lists this bar as not customisable, so your branding has to come from what surrounds it. A printed card, coloured paper filling or a printed box is where your name actually appears. Treat the chocolate as the contents and the packaging as the brand. The page also warns that warm weather may delay delivery.

The other trade-off is size. On its own, a small bar reads as a token rather than a gift. Use it as the accessible item inside a pack, or as the thing everyone gets alongside a smaller number of larger prizes.

View Small Bar Tony’s Chocolonely on Monday Merch

Large Bar Tony’s Chocolonely

Large Bar Tony’s Chocolonely

The same four business days and the same minimum of 15, in a format that can stand on its own rather than needing a pack built around it.

The size difference matters more than it sounds. A small bar inside a box reads as a component; a large bar handed over by itself still reads as a gift. If you are sending to a single office and want one simple item per person without assembling anything, this is the shorter path.

The same two caveats apply. The current page lists it as not customisable, so the branding lives on the card or the packaging, and warm weather may delay delivery.

View Large Bar Tony’s Chocolonely on Monday Merch

Christmas Card

Christmas Card

A printed card is the most underrated item in corporate gifting, and the numbers explain why it gets skipped: it is cheap, it is small, and it does not photograph well. Five business days, minimum of ten units, available in A5 or A6 with single-sided or double-sided full-colour printing.

Here is the argument for it anyway. The difference between a box of products and a gift is almost entirely the card. A pack arriving with no message reads as logistics; the same pack with a printed card and a handwritten name reads as a gesture from a person. For distributed teams who will never meet the people who sent it, that piece of card is doing more emotional work than the item it sits next to.

It also solves a deadline problem elegantly. If custom-printed boxes are out of reach on lead time, standard packaging plus a well-designed card gets you most of the way to a considered unboxing for a fraction of the production time. And where the product itself cannot be branded, as with the Tony’s bars and the Celebrations box, the card is the brand surface.

The obvious limitation is that it cannot carry a gift on its own. Treat it as the component that makes everything else land properly, rather than as the line item to cut when the budget tightens.

View Christmas Card on Monday Merch

Paper Filling

Paper Filling

Five business days, minimum 15, made from recycled paper fibre and available in several colours. It is the least glamorous item in the range and one of the most useful.

Filling is what separates a box of products rattling around in transit from a package that looks deliberate when it is opened. Choose a colour that matches your brand or the season and a plain box starts doing some of the work a printed one would, at five business days instead of eighteen.

This is the standard fallback when custom packaging has run out of runway. A card plus coloured filling in a stock box is a respectable unboxing, and you can still order it when the printed box is no longer reachable.

View Paper Filling on Monday Merch

Celebrations Mix Box

Celebrations Mix Box

For offices with a wide spread of tastes, a mixed box removes a decision you cannot make well on someone else’s behalf. Six business days, minimum 15.

The logic is straightforward. Any single confectionery choice will miss a chunk of your audience, and the person who does not like dark chocolate notices that you got it wrong. A mix sidesteps that entirely, and it works particularly well as a shared item left in a kitchen or on a reception desk where people take what they want.

As with the Tony’s bars, the current page lists this product as not customisable, so plan the branding around it rather than on it.

Where it falls down is personalisation. A mixed box is a good gift and it is not a specific one, so it will not carry a milestone or a thank-you that needs to feel individual. Use it for breadth, not for depth.

View Celebrations Mix Box on Monday Merch

Rituals Medium Gift Set

Rituals Medium Gift Set

Branded-label products change the maths of a gift, because the recipient recognises the name and prices it accordingly. The Rituals Medium Gift Set carries real retail presence, and at six business days with a minimum of 15 it is remarkably fast for something in the premium tier.

That combination is unusual and worth exploiting. Most gifts that feel this substantial sit at fifteen or twenty business days, which puts them out of reach once you are inside a month. This one does not, which makes it the strongest late-decision option when your budget is generous but your calendar is not.

It suits senior recipients, client gifting, and any situation where a gift needs to read as considered without you having assembled a multi-item pack.

The trade-off is that the branding is necessarily secondary, and the current page lists the set as not customisable. You are giving a Rituals product with your message attached, not your product. For a thank-you that is exactly right; for a brand-visibility exercise it is the wrong tool.

View Rituals Medium Gift Set on Monday Merch

Relaxed Sweatshirt

Relaxed Sweatshirt

Eight business days for custom apparel is the number to remember here, because most people assume branded clothing is a long-lead item and plan around a deadline that does not exist. Minimum 15, with transfer print, silkscreen and embroidery all available.

The oversized, relaxed cut is doing more work than it appears to. Company apparel fails when it fits badly, and a relaxed cut is forgiving across a much wider range of bodies than a fitted one, which matters enormously when you are ordering for a whole company and nobody can try anything on. It also reads as something people wear at home rather than as a uniform, which is the difference between a sweatshirt that gets worn and one that lives in a drawer.

The catch with all apparel is sizing. Ordering for 200 people means collecting 200 sizes, and that data-gathering exercise will take longer than the production run. A Team Store or Redeem Links fixes it by letting people choose their own, and it is the single best reason to use one.

View Relaxed Sweatshirt on Monday Merch

Full Colour Mug - Christmas

Full Colour Mug - Christmas

Mugs have an image problem in corporate gifting and it is deserved. Most of them are one-colour prints on cheap ceramic that go into a cupboard by January. Full-colour sublimation on a 0.3 litre stoneware body is what separates this from that category, because it lets you put a designed illustration across the surface instead of a logo floating in white space.

Nine business days, minimum 15.

It works best where the design does the heavy lifting: a proper seasonal illustration, a team in-joke, something with enough personality that the mug earns its place on a desk. Approach it as a canvas rather than a branding surface and it becomes a genuinely good gift at a modest price.

Be honest about the ceiling. A mug will not carry a milestone or a senior client relationship no matter how well it is printed. And if you are shipping to home addresses, ceramic means packaging weight and breakage risk that a sweatshirt does not have.

View Full Colour Mug on Monday Merch

Products with 10 to 15 business days of production

The middle band. Still stock products, but with more involved decoration or construction. Two to three weeks of production before approval and shipping are added.

Product

Standard production

Minimum quantity

Catalogue note

Soft Blanket

10 business days

15

Embroidery, an engraved PU leather badge and a printed patch are listed as options.

Large Premium Candle

10 business days

15

A scented glass candle with a custom sleeve option.

Rib Beanie

10 business days

15

Embroidery, an engraved PU leather badge and a printed patch are listed as options.

Jenga Game

10 business days

15

Pad print, digital print, engraving and a custom sleeve are listed as options.

Christmas Chocolate Advent

11 business days

50

An advent calendar with full-colour custom print.

AS Colour Heavyweight Sweatshirt

12 business days

15

A 400 gsm oversized sweatshirt with embroidery and digital transfer options.

Premium Bomber

15 business days

15

Digital transfer and embroidery options are listed.

Custom Soft Blanket

Custom Soft Blanket

If you want one product that survives longest in a recipient’s home, it is this one. Blankets have the highest retention rate of anything in corporate gifting, and the reason is unglamorous: everyone has room for another one, and nobody ever throws away a good blanket.

Ten business days, minimum 15, with embroidery, an engraved PU leather badge and a printed patch as the decoration options.

The word doing the work is “soft”. Blanket quality is entirely a tactile judgment, and a scratchy blanket is worse than no blanket because the recipient handles it once and forms a permanent opinion. This is the product where paying up is most clearly justified, since the difference between adequate and good is felt immediately and remembered for years.

It suits company-wide December sends, remote teams, and anyone you want to reach at home rather than at a desk.

The trade-off is weight and bulk. Blankets cost more to ship than almost anything else at comparable value, which matters if you are sending to 200 individual addresses rather than one office. Price the landed cost, not the unit cost.

View Soft Blanket on Monday Merch

Custom Large Premium Candle

Custom Large Premium Candle

Candles occupy a useful position: they feel like a gift rather than merchandise, they suit almost every recipient, and they carry a perceived value well above what they cost. Ten business days, minimum 15, as a scented glass candle with a custom sleeve option.

Size is the specification that matters. A small candle reads as a party favour; a large one reads as something bought from a shop. Since the whole point of this category is escaping the merchandise framing, the large format is not an upgrade so much as the version worth ordering at all. It also sits naturally alongside the rest of the winter business gifts range.

The custom sleeve is where your branding goes, which keeps the glass clean and makes the object look like a product rather than a giveaway.

Two honest caveats. Scent is personal, and a fragrance you love will genuinely irritate a portion of your recipients, so go neutral rather than distinctive. And candles are fragile in transit, which again is a home-delivery consideration rather than an office-delivery one.

View Large Premium Candle on Monday Merch

Rib Beanie

Rib Beanie

Timing is the argument here. A beanie given in July is merchandise; the same beanie given in December is a thing people put on immediately and keep wearing until March. Very few products have their seasonal peak aligned this precisely with corporate gifting season.

Ten business days, minimum 15, with embroidery, an engraved PU leather badge or a printed patch.

Rib knit is the construction detail worth knowing. The ribbing gives it stretch, which means one size genuinely does fit most people, and that removes the sizing problem that makes other apparel awkward to order at scale. For a company-wide send, a product with no size run is worth a great deal of administrative peace.

It fits teams in cold climates obviously, but also works for anyone doing outdoor events, site visits or commuting through winter.

The limitation is that it is a supporting item rather than a headline one. A beanie alone is a modest gift. Pair it with chocolate and a card, or with a sweatshirt, and the package works.

View Rib Beanie on Monday Merch

Christmas Chocolate Advent

Christmas Chocolate Advent

Compare this with the Tony’s bars at the top of the article and the difference is instructive: four business days there, eleven here, with the minimum jumping from 15 to 50.

What you get for that is a twenty-four day object rather than a single moment. An advent calendar sitting on someone’s desk from 1 December puts your brand in front of them every morning for most of a month, which is a different kind of value from a gift that is opened once. The customisation is full-colour print across the calendar itself, so the design is yours rather than a sticker on a stock box.

It suits office-based teams, client gifting where you want sustained presence, and any campaign built around the countdown rather than the day.

Two constraints. The minimum of 50 rules out small teams. And eleven business days is measured against 1 December, not against Christmas, because a calendar that arrives on the 10th has already lost a third of its purpose. That makes it roughly three weeks earlier than most people’s mental deadline.

View Christmas Chocolate Advent on Monday Merch

AS Colour Heavyweight Sweatshirt


AS Colour Heavyweight Sweatshirt

Where the Relaxed Sweatshirt is the volume option, this is the one you order when the apparel is the gift rather than part of it. Twelve business days, minimum 15, at 400 gsm with embroidery and digital transfer options.

Weight is the whole difference. Heavyweight fabric hangs differently, survives more washes, and is immediately distinguishable by touch from a standard sweatshirt, which recipients notice without being able to articulate why. AS Colour is a recognised name among people who care about blanks, which adds a layer of credibility with design-literate teams.

This is the right pick for creative agencies, product teams, and any company whose employees have opinions about clothing. It also works as a recognition or long-service gift where a single item needs to carry the whole gesture.

The cost is real and so is the sizing problem, which is worse here than on the relaxed fit because a heavyweight garment is less forgiving. Use a Team Store and let people choose.

View AS Colour Heavyweight Sweatshirt on Monday Merch

Premium Bomber


Premium Bomber

Outerwear is the top of the apparel range and the point at which branded clothing becomes something people wear outside the building by choice. Fifteen business days, minimum 15, with digital transfer and embroidery options.

A bomber is the most versatile silhouette in branded outerwear because it reads as a jacket rather than as workwear. Keep the branding small and tonal and it becomes a garment someone wears to things that have nothing to do with your company, which is the highest compliment corporate apparel can earn.

It suits senior gifting, long-service recognition, small teams where you can afford to spend properly on everyone, and companies where the brand genuinely carries some cachet.

Two things to weigh. At fifteen business days you have very little margin for a slow approval, so this needs a fast decision. And outerwear sizing is the least forgiving of all, which makes individual selection close to mandatory rather than merely advisable.

View Premium Bomber on Monday Merch

Products with 16 to 36 business days of production

The long band, and the one people miss. Everything here is either manufactured to your specification or produced in a process that cannot be shortened. If a product in this section is on your list, it is the earliest decision you have to make.

Product

Standard production

Minimum quantity

Catalogue note

Dopper Insulated 580 ml

16 business days

36

A double-wall vacuum bottle with pad print and digital print options.

Samsonite Suitcase

18 business days

15

A 44 l suitcase with laser engraving and full-colour doming options.

Single Sided Full Colour Box – Christmas

18 business days

30

Full-colour print on the outside of a corrugated cardboard box.

Bespoke Christmas Socks

21 business days

50

Fully customisable all over, with embroidery and label options.

Bespoke Knitted Christmas Sweater

24 business days

25

Knitted and embroidery options for all-over customisation.

Bespoke Tote Bag

36 business days

100

A cotton canvas tote with several print and embroidery options.

The pattern is consistent: anything with Bespoke in the name is a manufacturing run, not a decoration job. That is where the extra weeks go.

Dopper Insulated 580 ml


Dopper Insulated 580 ml

Dopper is a recognised sustainability brand rather than a generic bottle with an eco claim attached, which is the difference between a credential and a marketing line. Sixteen business days, and note that the minimum is 36 rather than the usual 15.

Insulated double-wall construction is what makes it a daily-use object rather than a desk ornament. A bottle that keeps a drink cold for a working day gets carried; one that does not gets replaced by whatever is in the kitchen. The 580 ml capacity sits in the useful middle, large enough to matter and small enough to fit a bag. Pad print and digital print are the decoration options.

It suits companies with a genuine sustainability position, and any team where the gift needs to align with stated values rather than just look nice.

The higher minimum rules it out for very small teams, and sixteen business days puts it firmly in the plan-ahead group rather than the late-decision one.

View Dopper Insulated 580 ml on Monday Merch

Samsonite Suitcase

Samsonite Suitcase

Executive gifting has a specific test: would the recipient have considered buying this themselves? A 44 litre Samsonite suitcase passes it comfortably, which is why it sits at the top of the Christmas range. Eighteen business days, minimum 15, with laser engraving and full-colour doming options.

Luggage is an unusually good category for senior recipients because it is expensive enough that people delay replacing it, and visible enough that a good one is noticed. The brand does the heavy lifting on perceived value, and your branding sits as a discreet engraved mark rather than as the point.

Use it for long service, C-suite gifting, top-tier client relationships, or a small leadership team where per-head spend is high by design.

Two practical notes. Shipping weight is significant, so individual home delivery costs real money. And this is emphatically not a company-wide gift; deploying it broadly would consume a budget that could have given everyone something good.

View Samsonite Suitcase on Monday Merch

Single Sided Full Colour Box – Christmas

Single Sided Full Colour Box – Christmas

Custom packaging is the item most likely to blow your timeline, and most teams discover this after choosing everything else. Eighteen business days, minimum 30, printed full colour on the outside of a corrugated cardboard box.

What it buys you is the unboxing moment. A gift arriving in a plain brown carton and the same gift arriving in a full-colour printed box are different experiences, and the second one is the version that gets photographed and posted. For any send where you want the moment to travel beyond the recipient, the box is not decoration, it is the point.

It suits multi-item packs, client sends, and anything where the gift is also a piece of marketing.

The timeline is the whole problem. Because packaging is usually the last thing people specify, it is routinely the thing that forces a compromise. Decide on packaging first, not last. If you are already past the window, standard packaging with a printed Christmas Card and coloured Paper Filling gets you a respectable version at five business days.

View Single Sided Full Colour Box – Christmas on Monday Merch

Bespoke Christmas Socks

Bespoke Christmas Socks

Socks are the sleeper hit of Christmas gifting, and the reason is that they are the one garment where a loud design is not only acceptable but expected. Twenty-one business days, minimum 50.

Bespoke means the product is customisable all over rather than printed onto a blank, with embroidery and label options, so the pattern is worked into the sock rather than applied to it. That is a considerably better product than a printed sock, and it is why the lead time is three weeks rather than one. You can run a full design across the whole sock, not just a logo on the ankle.

They suit company-wide sends particularly well because sizing is broad and forgiving, which sidesteps the problem that makes most apparel difficult at scale.

The minimum of 50 rules out small teams, and three weeks of production is unforgiving. This is a product you commit to early or not at all.

View Bespoke Christmas Socks on Monday Merch

Bespoke Knitted Christmas Sweater

Bespoke Knitted Christmas Sweater

The Christmas sweater has become a fixture of the December office calendar, and a bespoke knitted one is the version people photograph, keep, and wear again the following year. Twenty-four business days, minimum 25.

Knitted rather than printed is the distinction that matters and the reason for the timeline. A printed sweatshirt with a festive graphic is a sweatshirt; a knitted sweater has the pattern built into the garment, which is what makes it read as a real Christmas jumper rather than a corporate approximation of one. It is the difference between a product people put on for a photo and one they actually wear.

It suits companies with a strong internal culture, teams that run a Christmas jumper day, and any business planning to use the moment for social content.

The constraints are real: a minimum of 25, nearly five weeks of production before shipping, and a sizing exercise across the whole company. If you want one this year and have not started, that conversation needs to happen immediately.

View Bespoke Knitted Christmas Sweater on Monday Merch

Bespoke Tote Bag

Bespoke Tote Bag

The longest standard production time in the Christmas range at thirty-six business days, with the highest minimum at 100 units. That is more than seven working weeks before anything ships.

Bespoke construction means the cotton canvas bag is made to your specification rather than printed on a blank, so dimensions, material, handle length and finish are all yours to set, with several print and embroidery options on top. For a company that wants a tote people genuinely use rather than another thin giveaway bag in a cupboard, that control is the difference, and heavyweight construction is the single specification that determines whether a tote survives its first grocery shop.

It suits larger organisations, retail and consumer brands, and any company treating the bag itself as a brand asset rather than as packaging.

Both constraints bite hard. A hundred units is beyond many teams, and at thirty-six business days this is not a Christmas product unless the decision was made in the summer. If you are outside that window, a stock tote with a good print gets you most of the way at a fraction of the timeline.

View Bespoke Tote Bag on Monday Merch

How to set a reliable Christmas deadline

Check the band first. If it is already the third week of November, no amount of working backwards will produce a branded gift, and the honest answer is a pre-made one. If you are inside the window, the arithmetic below gives you the date.

Open the chosen product page and select the destination in the delivery timeline. Use the later end of the published shipping range when working backwards from the required in-hands date. Then add the product’s standard production time, and keep your internal approval date earlier than that calculated production start, because the site states that revisions or later approval move delivery.

One lever is worth knowing about before you panic. Most product pages offer an Express option, described as two days faster for a 10 per cent service fee. Two days will not rescue a bespoke item that needed ordering a month ago, but it is often exactly the difference on a product sitting one or two days outside the window.

A few situations change the maths.

If you are starting late, work exclusively from the first band. Chocolate, cards, filling, mugs and the Relaxed Sweatshirt all produce in under ten business days, and a well-chosen fast product that arrives on time beats a bespoke one that arrives in January. The Rituals Medium Gift Set is the strongest option in that band when budget is available, because it is the only genuinely premium item that produces in six. If you are still choosing what to send, our company Christmas party gift ideas cover the selection side of the decision.

If you are ordering a multi-item pack, the slowest component sets the deadline for everything. One bespoke item in a pack of five puts the whole pack on that item’s clock. Either commit early or build the pack entirely from the first two bands.

If the project needs kitting, individual home fulfilment or customs handling, ask Monday Merch for a project-specific schedule. No standard published allowance covers those steps, and adding a guess to your own plan will not make it more accurate. Our guide to managing inventory and fulfilment over the holiday season covers what tends to go wrong at this stage.

If you want bespoke knitwear, custom socks or printed boxes, those are the earliest decisions on your list. All three sit between 18 and 24 business days before shipping, and the approval stage is what will sink you rather than the production.

If you want to never have this problem again, produce in autumn and hold the stock in warehousing, then release in December. Separating the production clock from the delivery clock removes the deadline entirely, and a Team Store lets recipients pick their own size and supply their own address.

Free design concepts and a quote within 24 hours mean the front of this process costs you almost nothing. The back of it is unforgiving. If a date is already tight, talk to our sales team with your in-hands date and destination and we will tell you what is still reachable.

FAQ

When should I order Christmas merch for employees?

September gives you the full range. October still covers around 95% of options. Early November is the last call for some semi-custom products, and from the third week of November the viable range narrows to pre-made gifts and simple products with no logos. Within whichever band you are in, choose the in-hands date, open the live product timeline, select the destination, and work backwards using the published production and shipping ranges.

Can I order branded Christmas merch in December?

No. December is for in-stock products only, with no branding. Anything not already packed will not arrive before Christmas, so if a logo has to appear on the gift, the decision has to be made in November at the latest.

I have missed the deadline for branded gifts. What now?

Two options. Either take an in-stock, unbranded product that is ready to ship, or keep the custom work and deliver it in January as a New Year gift pack. The second is usually the better one: you keep the branding and the quality, you can order after everyone has chosen, and the gift arrives when people are back at their desks rather than competing with everything else in December.

Can Monday Merch store Christmas orders placed early?

Yes, and it is free. Christmas orders qualify for free warehousing, including projects started as early as August. We hold the stock and dispatch it on your schedule, in bulk or directly to individual employees and clients, which takes the deadline out of the equation entirely.

How long does Christmas merch take to produce?

Current standard production times across the Christmas range run from 4 to 36 business days. The Small and Large Tony’s Chocolonely bars are listed at 4 business days. The Bespoke Tote Bag is listed at 36.

What has the shortest standard production time?

The Small Bar Tony’s Chocolonely and Large Bar Tony’s Chocolonely are both listed at 4 business days, with a minimum quantity of 15. Their current pages say they are not customisable, so the branding has to sit on the packaging. The Christmas Card and Paper Filling follow at 5 business days.

Does shipping take the same time for every country?

No. The current website estimate is 1 to 2 business days for the Netherlands, 2 to 3 for Germany, 2 to 3 for the United Kingdom, and 3 to 5 for the United States. Check the live product timeline before confirming a delivery date.

Does production begin as soon as I ask for a quote?

No. The website publishes free designs and a quote within 24 hours, and product timelines show 0 to 1 business day for free design. It also states that revisions or later approval move the dates. A fixed approval duration is not published, so plan your internal sign-off separately.

Can I still order if the project starts late?

Possibly, depending on the product, destination and required in-hands date. Use the live delivery timeline rather than a generic November cut-off. Products with shorter standard production times give you more room, but the final date still depends on shipping and approval.

Table of Contents

Heading

/refer

Stay up to date

Stay up to date

Stay up to date

More Articles

More Articles

Read more about how to effectively use company swag or merch Packs for your business.